Smart Setup Station makes changeover work quick and easy
As market needs diversify, mass customization that achieves QCD at the same level as mass production is being required of manufacturing sites. However, in the field of high-mix production in which products are frequently changed, decreases in production efficiency caused by increases in changeover frequency is a major issue.
At many production sites the feeder setup work is being moved offline in order to shorten the setup changeover time, and a batch changeover method using feeder exchange units has become popular. However, offline changeover work is very detailed and time-consuming, as it involves a lot of work from checking out parts to setting up feeders, as well as having to perform all the required checks. In addition, this is a process that is difficult to run based on a schedule because it is highly dependent on people which means that work times vary depending on the skills of the workers.